Isometric illustration of the new E6 Storslett bridge: a network arch bridge over the Reisaelva river on a terrain block
Built with Skala
Machine control · Water & sewer · Electrical · 2024–2026 · Nordreisa, Troms, Norway

E6 Storslett bridge

New E6 crossing of the Reisaelva river in central Storslett, replacing two narrow 1955 bridges: an 87-metre network arch bridge (17 m wide, 17 m high) and a 26-metre slab bridge. The main span was built on land and launched into place in November 2025.

Client
Norwegian Public Roads Administration
Contractor
Christie & Opsahl (main contractor)
Cost
NOK 455 million incl. VAT
Construction period
26 months; opened to traffic on 3 September 2026

Our role Carried out by Atoma Nordic AS: all machine control models and the water, sewer and electrical modelling were made with Skala products.